Would you like a North Sails Expert to call you? Just leave us your number and a short message we will direct the inquiry to the right person to help. We promise to call as quickly as possible, but at some times we may be out sailing. Looking for a quote? Please use the request a quote tab above.

Let's Talk
Sending

Find My Expert

Please search by name or location to find your local North Sails Expert.

Search
Generic filters
Filter by Custom Post Type

Find My Loft

Find your local loft below.

Search
Generic filters
Exact matches only
Filter by Custom Post Type

Are you looking for something you can’t find on our web site? Do you need product information or help with a sail? Just send us a message and we will respond promptly.

Demande d'informations
Sending

Are you ready to buy? Would like to learn more about products and prices? Please fill in the forms below and we will have your local North Sails Expert create a custom sail proposal for you.

Demande de devis
Sending
North Sails RESOURCES

Jibe Set: How To Do It Right

  • Last Updated: janvier 16, 2018
  • Print Friendly, PDF & Email

If the angle of the downwind leg requires an immediate jibe, you’ll need to learn how to do a jibe set. Jibe sets are more difficult than bear away sets, because they require carefully coordinated crew work. Also, you must wait until after the jibe to set the pole. Since the pole helps the spinnaker fill by holding it away from the boat and other sails, there are several details critical to a successful jibe set

Many crew have two tasks in the process, so practice is vital. To keep it simple, we’ll assume we’re approaching the mark on starboard, bearing away, and jibing to sail the next leg on a port broad reach.

Set Up (during final approach)

Hook up the spinnaker on the starboard side, as far forward as possible. Set up the pole on the port side of the forestay—since it will be used once you jibe to port—with topping lift, downhaul, and guy in place. Make sure the guy is not fouled. The topping lift can be rigged under the jib sheets. (Alternatively, if it is long enough, it can be rigged outboard of the jib to port.)

As you round the mark and bear away, start the hoist. At the same time, pull the sheet (on the starboard side) just far enough to separate the spinnaker clews.

Next, jibe. Make sure you jibe the jib and ease out the old (port) jib sheet; then raise the spinnaker pole. Once the pole is up, trim the guy square with the wind. As soon the spinnaker is fully hoisted, trim the sheet and drop the jib.

Variations

No Pole

You can execute a jibe set without rigging a pole. Sometimes it is faster and easier this way, particularly if the decision to jibe set was a late one, and you don’t have time to make sure the pole is hooked up cleanly.

In this variation the foredeck crew acts as the pole, hand holding the guy outboard until the mast crew can hook up and set the pole. This is not recommended in heavy air.

Tack Set

Like jibe sets, tack sets do not allow complete preparation before the set. When tacking right at the mark, the spinnaker pole cannot be set until the tack is complete.

Prepare the spinnaker as usual, and hook up the pole but do not raise it. As you round the mark, raise the pole and hoist the spinnaker simultaneously. Have the foredeck crew lift the pole while the guy trimmer tails the topping lift. Tension on the guy will prevent the pole from going up, so do not pull the guy until the pole is set. Meanwhile, the mast crew can jump the halyard while the pit crew tails.

Building speed with the main and jib as you hoist the spinnaker is critical to a successful tack set. Proper trim can prevent you being passed by boats carrying a full head of steam into the mark.